皇冠体育注册平台(www.hg108.vip):Fukushima debris removal delayed by another year

皇冠买球网www.hg108.vip)是皇冠体育官网线上直营平台。皇冠买球网面向亚太地区招募代理,开放皇冠信用网代理申请、皇冠现金网代理会员开户等业务。皇冠买球网可下载皇冠官方APP,皇冠买球网APP包括皇冠体育最新代理登录线路、皇冠体育最新会员登录线路。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

皇冠体育注册平台www.hg108.vip)是一个开放皇冠体育即时比分、皇冠体育官网注册的平台。皇冠体育注册平台(www.hg108.vip)专业解决皇冠体育会员怎么申请开户、怎么申请皇冠体育信用盘代理、皇冠体育公司的代理怎么拿的问题。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。

添加回复:

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。